Loading...
BP5341BUILDING PERMITAPPLI Jurisdiction of City of Blair, Nebraska 218 South 16th Street Blair, Nebraska 68008 (402) 426-4191 CATI O N Permit 5 3 41 Application Date: ~- ~- ~~ Issue Date: (~ `~0 ~~~ Permit Fee: $ /~`~ JOB ADDRESS ~~p LEGAL 1 ' DESCR. LOT NO. BLK. TRACT ^ SEE ATTACHED SHEET 2. OWNER ~ I L' a ~..5 ,/~~ ~ I ~1 /~ M~ADDRE~ , SS n ~ ZIP ~_ PHONE _ ~ ~~ / ~( PHONE 3. CONTRACTOR 1~1- ~MAIL~Dp~ESS ~ 1 ,,/l[[//11 l1/1 '`7~Lll t, ,V~~/L_ ~~` C~~~ CENSENO. 7 USE OF BUILDING 4. 5. Class of Work: NEW ^ ADDITION ^ALTERATION ^ REPAIR ^ MOVE ^ REMOVE 6. Describe Work: e f~C~ /;~~~ ~ c ~~ 7. Sq. Footage of Structure p~duding Basemem and Garage>: $. Change of Use From: Change of Use To: g, Valuation of Work: $ Floodway Yes ^ No ^ Dev. Permit 10 Floodplain: Fringe Yes^ No ^ BFE EIev.Ced. 11. Current Zoning: Site Plan Attached ^ Complete Plans Attached ^ ^ ^ Approximate Completion Date ~~"~ No 12. State Fire Marshall Required: Yes Inspections Required and Fees 13. Special Use Permit Required: Yes ^ No ^ Utilities Sewer Tap Water Tap 14. Variance Required: Yes ^ No ^ sewer Water Service 15. Minimum Setbacks: Front Side Rear septic Remote 16. Sidewalk Required: Yes^ No ^ Waiver Approved Building APPLICATION ACCEPTED BY PLANS CHECKED BY APPROVED FOR ISSUANCE BY Footings Drywall -~ lob (before finish) NOTICE Framing Final ~'~-~3 Separate permits are required for electrical, plumbing, heating, ventilating and air condi- tioning, and septic systems. By my signature below, I achnowledge that payment of the Electrical building permit application fee does not constitute issuance of this building permit. I further agree that construction covered by this permit application shall not be commenced until I Rough-in Fixtures have received a copyof this application form signed bythe Building Inspectorand stamped 'APPROVED'. Final Permanent Service I hereby agree to perform the proposed work in accordance with the specifications setforth above and in accordance with the codes~ordinances of the City of Blair and the State of Temporary Service Nebraska. I understand that this permit is void if work is not commenced within 1 BO days or is ted ithin 2 ye ate of is e. Mechanical 16~~ Rough-in ABC IGNATURE OF OWNER)CONTRACT ~0 AUTHORIZED ENT DATE Final ~~ U ~ Plumbing Ground Work SIGNATURE OF OWNER (IF OWNER BUILDER) DATE Rough-in Final WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT Comment: Approv By,; ,~s ~~ _....-- ---- -...._ ~/~ o.~ .~ CITY INSPECTION SLIPS Inspection has been requested for ~~ ~~ ~ '' ~~~~ ~"I/~- Location of Building By ,,,~-~C` c`~.,~ S ~', 1~~. X7'1 ~ ~~ ~ Na e of Company ~A f/ On ~~L.1Z~ ~~ ~ J ~~GU~ ~ ~ ~~,/l Type of Inspection At ~' ~ ..c3 s~-of~ Date T'me Results of the Inspection are: ~ ", \ City epresentative ~. '~