Check off Sheet.tif2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF -.BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final Inspection
218816 th Street, Blair, NE 68008
Because of limitations caused by the Infeasibility to perform detailed Inspections which would
W interfere with reroofing work, please indicate compliance with the following requirements
foilowina this reroofing Job.
Property Address:
Contractor or Homeowner (If self) :
Permit : MS -20 I Um13 +
Installation Date:.5�!_1!_L!l
YE§ NO
❑ The materials and methods of appilcatlon used for rsoovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
❑ ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self -adhering polymer modified bitumen sheet was Mailed and
Wends at least from the eave's edge to a point at least 24 Inches lns(de the exterior
wall line of the building. (11905.2.7.1)
❑
sTVUeTURAL COMPONENTS ARE SOON The structural roof components are
capable df supportlhg the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (11907.2)
[� Fme narp coygRING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by sectlon R907.3
❑ DID NOT USE RUSTED MIML R FLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter -flashing were not reinstalled if rusted. (11907.6)
❑
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manuiaoWrWs Installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (8907.8)
h -7
Slgrgwrffl Installer Date
/ApaJ��
Sig of Permit Holder Date