Check off Sheet.tif2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF -BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final inspection
218 S 16 Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
no interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing Job.
Property Address:
Contractor or Homeowner (if sell) : , I I t( AUll( I U2 it`'
Permit#;
Installation Date: — 7
YE§ NO
❑ The materials and methods of application used for rdcovering or replacing the existing
roof covering comply with the requirements of the building code. (11807.1)
❑ ICE PRO'T'ECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self -adhering polymer modified bitumen sheet was installed and
Wends at leamt from the save's edge to a point at least 24 Inches tns(de the exterior
wall line of the building. (11905.2.7.1)
❑ STRUCTURAL, COMPONENTS AMS_OUND:_ The structural roof components are
capable of suppordhg the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
❑ EMSTING COVERING MS BNOVED: Existing roof covering was removed for one
of the reasons required by section 8907.3
❑
DID NOT USE RUSTED ATOM OR FL.A3HING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter -flashing were not reinstalled If rusted. (R907.5)
❑ FJAGNINa INISTA413D PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's Installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to Installation. (11907.6)
•/-7
Sig D6te
81g.6Wof Permit Holder Date