Loading...
Check Off Sheet.tif2009 INTERNATIONAL RESIDENTIAL CODE CITY OFBLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final inspection 298 S 76 Street, Blair, NE 68008 Because of ilmttations caused by the Infeasibility to perform detailed Inspections which would not interfere with reroofing work, please indlcate compliance with the following requirements failawina this reroofing Job. --� V i q Property Address: quo 2> t 1T [� I% , 11� Contractor or Homeowner (if self) : Permit: MS -20,(,x,( . Installation Date: 1Y7AV -64a, YES NO ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.9) ❑ ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self -adhering polymer modffted bitumen sheet was Installed and Wends at least from the eaye's edge to a point at least 24 inches Ins(de the exterior wall line of the building. (8905.2.7.4) ❑ STRUCTURAL. COMPONENTS ARE SOUND: The structural roof components are capable df suppordhg the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) ❑ Wa$MNG COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 ❑ DiD NOT USE RUSTBD METAL OR FI ASHING: E)dsting vent flashing, metal edges, drain outlets, collars or metal counter -flashing vers not reinstalled If rusted. (11907.6) ❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (11907.6) /PQ ,-7 Sig d! ary installer Date • .��%a a l l T7 31g of Permit Holder Date