Check Off Sheet.tif2009 INTERNATIONAL RESIDENTIAL CODE
CITY OFBLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final inspection
298 S 76 Street, Blair, NE 68008
Because of ilmttations caused by the Infeasibility to perform detailed Inspections which would
not interfere with reroofing work, please indlcate compliance with the following requirements
failawina this reroofing Job. --� V i
q
Property Address: quo 2> t 1T [� I% , 11�
Contractor or Homeowner (if self) :
Permit: MS -20,(,x,( .
Installation Date: 1Y7AV -64a,
YES NO
❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (8907.9)
❑ ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self -adhering polymer modffted bitumen sheet was Installed and
Wends at least from the eaye's edge to a point at least 24 inches Ins(de the exterior
wall line of the building. (8905.2.7.4)
❑ STRUCTURAL. COMPONENTS ARE SOUND: The structural roof components are
capable df suppordhg the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
❑ Wa$MNG COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
❑ DiD NOT USE RUSTBD METAL OR FI ASHING: E)dsting vent flashing, metal edges,
drain outlets, collars or metal counter -flashing vers not reinstalled If rusted. (11907.6)
❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (11907.6)
/PQ ,-7
Sig d! ary installer Date
• .��%a a l l T7
31g of Permit Holder Date